Follow regional codes for structural brickwork and curing.
Keep mortar joints 10–12 mm, butter both head and bed joints, and tool the joint once it begins to firm up.
- Soak clay bricks in hot climates to avoid flash drying.
- Stage pallets within 10 m of the wall to limit handling.